|
|
TM 9-2320-361-24-2
0391 00
DECONTAMINATION MOUNTING KIT REPLACEMENT (Contd)
REMOVAL
1.
Slide boot (5) up gearshift lever (6).
2.
Remove nut (4), screw (2), washer (1), and gearshift lever (6) from transmission stud shaft (3).
3.
Remove thirteen bolt-assembled lockwasher (8) and intermediate tunnel (7) from cab floor (9).
4.
Remove four locknuts (12), capscrews (10), and decontamination mounting bracket (11) from
intermediate tunnel (7). Discard locknuts (12).
INSTALLATION
1.
Install decontamination mounting bracket (11) on intermediate tunnel (7) with four capscrews (10)
and new locknuts (12).
2.
Install intermediate tunnel (7) on cab floor (9) with thirteen new bolt-assembled lockwashers (8).
3.
Install gearshift lever (6) on transmission stud shaft (3) with washer (1), screw (2), and nut (4).
4.
Slide boot (5) down over end of gearshift lever (6).
5.
Install decontamination apparatus (TM 3-4230-204-12&P).
6.
Connect battery ground cable (WP 0126 00).
7.
Release parking brake and remove wheel chocks (TM 9-2320-361-10).
0391 00-2
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |