|
|
TM 9-2320-361-24-2
0349 00
TRANSMISSION POWER TAKEOFF (PTO), COVER, AND GASKET MAINTENANCE (Contd)
INSTALLATION (Contd)
8.
Install new gasket (2) and cover (3) on PTO (1) with six new lockwashers (4) and screws (5).
9.
Fill transmission to proper fluid level (WP 0018 00).
10.
Connect battery ground cable (WP 0126 00).
11.
Release parking brake and remove wheel chocks (TM 9-2320-361-10).
1
5
4
3
2
END OF WORK PACKAGE
0349 00-4
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |