|
|
TM 9-2320-361-24-2
0348 00
TRANSFER CASE POWER TAKEOFF (PTO) MAINTENANCE (Contd)
REMOVAL
1.
Loosen setscrew (6) and remove cotter pin (9), nut (8), yoke (7), and woodruff key (11) from PTO
spindle (10). Discard cotter pin (9) and woodruff key (11).
2.
Disconnect line (1) from oil pump (12).
3.
Remove four screws (13), lockwashers (14), two nuts (4), lockwashers (3), PTO (5), and gasket (15)
from transfer case (2). Discard lockwashers (14) and (3) and gasket (15).
4.
Remove screw (19), washer (18), and clamp (17) from transfer case (2).
5.
Remove line (1) and elbow (16) from transfer case (2).
CLEANING
Remove gasket material and debris from transfer case (2) and PTO (5) mating surface.
INSPECTION AND REPAIR
1.
Check PTO (5) and transfer case (2) mating surface for scratches, cracks, and galling. Refer to
TM 9-2520-246-34-1 if scratched, cracked, or galled.
2.
Check PTO gear for wear, cracks, and discoloration. Refer to TM 9-2520-246-34-1 if gear teeth are
worn, cracked, or discolored.
3.
Inspect studs (20). Replace studs (20) if damaged (WP 0021 00).
INSTALLATION
NOTE
Prior to installation, coat threads of elbow with sealing
compound.
1.
Install elbow (16) on transfer case (2).
2.
Connect line (1) to elbow (16) and install line (1) on transfer case (2) with clamp (17), washer (18),
and screw (19). Tighten screw (19) 6077 lb-ft (81104 Nm).
3.
Install new gasket (15) and PTO (5) on transfer case (2) with two new lockwashers (3), nuts (4),
four new lockwashers (14), and screws (13). Tighten nuts (4) 3240 lb-ft (4354 Nm). Tighten
screws (13) 6077 lb-ft (81104 Nm).
4.
Connect line (1) on oil pump (12).
5.
Install new woodruff key (11), yoke (7), and nut (8) on spindle (10). Tighten nut (8) 150250 lb-ft
(203339 Nm) and install new cotter pin (9) and tighten setscrew (6).
6.
Install transfer case (WP 0138 00).
0348 00-2
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |