Click here to make tpub.com your Home Page

Page Title: VAN BODY CEILING PANEL REPLACEMENT - continued
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-361-24-2
0307 00
VAN BODY CEILING PANEL REPLACEMENT (Contd)
WARNING
Gloves, eyeshields, and dust mask must be worn during panel
removal and installation. Failure to do so may result in injury
to personnel.
NOTE
Ceiling panels on both sides of van ceiling are removed and
installed the same. This procedure covers the passenger side.
REMOVAL
1.
Remove twenty screws (5) and center ceiling panel (6) from two ceiling panels (1), ceiling panel (8),
and frame (2).
2.
Remove thirty-two screws (7), two ceiling panels (1), and ceiling panel (8) from frame (2).
INSTALLATION
1.
Position two ceiling panels (1) and ceiling panel (8) on frame (2) and align panel (1) screw holes (4)
with screw holes (3) in frame (2).
2.
Install two ceiling panels (1) and ceiling panel (8) with thirty-two screws (7).
3.
Install center ceiling panel (6) on frame (2), two ceiling panels (1), and ceiling panel (8) with
twenty screws (5).
4.
Install primary or secondary van body heaters (if removed) (WP 0384 00).
5.
Install 115-volt receptacle strip (WP 0312 00).
6.
Install multibreaker and safety switch boxes (WP 0317 00 and WP 0318 00).
7.
Install exhaust blower motor and bracket (WP 0301 00).
8.
Install front and side window sashes (WP 0320 00 and WP 0321 00).
9.
Install dome lights (WP 0302 00).
10.
Connect battery ground cable (WP 0126 00).
11.
Release parking brake and remove wheel chocks (TM 9-2320-361-10).
0307 00-2

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business