Click here to make tpub.com your Home Page

Page Title: FUEL HOSE AND NOZZLE REPLACEMENT (M49A2C) - continued
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-361-24-2
0269 00
FUEL HOSE AND NOZZLE RPELACEMENT (M49A2C) (Contd)
WARNING
Diesel fuel is flammable. Do not perform fuel system procedures
near open flames. Injury or death to personnel may result.
CAUTION
To prevent fuel from leaking, all valves must be in off position.
Failure to comply may result in injury to personnel.
FUEL NOZZLE HOLDER REMOVAL
1.
Remove nozzle strap (17) from nozzle (5).
2.
Remove nozzle (5) from nozzle holder (18).
3.
Remove locknut (19), screw (15), washer (16), and strap (17) from nozzle holder (18). Discard
locknut (19).
4.
Remove two locknuts (13), screw (14), and nozzle holder (18) from tanker body (12). Discard
locknuts (13).
FUEL HOSE AND NOZZLE REMOVAL
1.
Remove nut (4) and electrostatic discharger (6) from nozzle (5).
2.
Remove nozzle (5) from bushing (3).
3.
Remove bushing (3) from fitting (2).
4.
Remove fitting (2 ) from hose (1).
5.
Remove two nuts (11), screws (8), coupling (7), and gasket (9) from meter outlet tube (10) and
tube (5). Discard gasket (9).
6.
Remove tube (20) from fitting (21).
7.
Remove fitting (21) from swivel (22).
8.
Remove swivel (22) from bushing (23).
9.
Remove bushing (23) from hose (1).
FUEL HOSE AND NOZZLE INSTALLATION
NOTE
Male pipe threads must be wrapped with antiseize tape before
installation.
1.
Install bushing (23) on hose (1).
2.
Install swivel (22) on bushing (23).
3.
Install fitting (21) on swivel (22).
4.
Install tube (20) on fitting (21).
5.
Install tube (20) and new gasket (9) on meter outlet tube (10) with coupling (7), two screws (8), and
nuts (11).
6.
Install fitting (2) on hose (1).
7.
Install bushing (3) on fitting (2).
8.
Install nozzle (5) on bushing (3).
9.
Install electrostatic discharger (6) on nozzle (5) with nut (4).
0269 00-2

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business