|
|
TM 9-2320-361-24-1
0023 00
PREVENTIVE MAINTENANCE CHECKS AND SERVICES (PMCS) (Contd)
Table 1. Preventive Maintenance Checks and Services (PMCS) (Contd).
ITEM
ITEM TO CHECK/
EQUIPMENT NOT
INTERVAL
PROCEDURE
NO.
SERVICE
READY/AVAILABLE IF:
Annually
Rear
d. Test spring seat bushing by placing
suspension
jack under torque rods (1) and raise
(Contd)
vehicle until springs (3) are raised off
wear pad (7) but not touching spring
bracket (6). Position prybar between
U-bolt saddle (4) and lifting pin (5).
Pull up on prybar. If there is play,
inspect bushings for damage or adjust
as necessary.
NOTE
Use caution not to lose the detent ball
and spring when removing/installing the
pin.
Annually
e. Remove lifting pin (6). Clean and
lubricate with GAA and re-install.
4
4
5
6
7
3
7
1
1
8
a. Using a .001 in. (0.025 mm) thick
Semiannually Frame and
30
a. Rivets are
feeler gauge, check for space between
crossmembers
missing or loose.
rivet head and riveted frame member.
Penetration of the feeler gauge
between rivet and riveted member is
reason to suspect the riveted
connection and/or rivet should be
replaced.
0023 00-15
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |