|
|
TM 9-2320-209-34-2-3
(2) 115-volt test.
(a) Bleeding fuel lines.
FRAME 1
Refer to TM 9-2320-209--10.
Connect 115-volt line.
1.
Turn shut-off cock (1) to ON position. Tell soldier B when
Soldier A 2.
ready.
Turn power converter selector switch (2) to 115-VOLT position.
Soldier B 3.
4.
Loosen line connector (3).
5.
Turn heater switch (4) to START positior..
6.
When fuel starts to drip from fuel line (5) turn heater switch
(4) to OFF position.
Tighten line connector ( 3).
7.
GO TO FRAME 2
21-107
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |