Click here to make tpub.com your Home Page

Page Title: VAN BODY PERSONNEL HEATER OPERATING TEST (TRUCKS M109A2, M109A3, M185A2, AND M185A3). - continued
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-209-34-2-3
(2) 115-volt test.
(a) Bleeding fuel lines.
FRAME 1
Refer to TM 9-2320-209--10.
Connect 115-volt line.
1.
Turn shut-off cock (1) to ON position. Tell soldier B when
Soldier A 2.
ready.
Turn power converter selector switch (2) to 115-VOLT position.
Soldier B 3.
4.
Loosen line connector (3).
5.
Turn heater switch (4) to START positior..
6.
When fuel starts to drip from fuel line (5) turn heater switch
(4) to OFF position.
Tighten line connector ( 3).
7.
GO TO FRAME 2
21-107

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business