|
|
TM 9-2320-209-34-2-3
FRAME 8
Put new preformed packing (1) on overheat thermostat (2). Put overheat
1.
thermostat (2) and cover (3) on heater (4).
Put lockwasher (5) on stud (6). Screw on and tighten nut (7).
2.
Put fuel control valve (8) on fuel standpipe (9). Screw on and tighten
3.
fitting (10).
GO TO FRAME 9
21-58
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |