TM 9-2320-209-34-2-3
FRAME 5
1.
Working at front of right air reservoir (1), put on retaining strap (2).
2.
Put in two capscrews (3) and locknuts (4).
CAUTION
Do not tighten coupling nut (5) too much. Finger tighten
coupling nut onto fitting, then tighten nut 1/8 turn.
3.
Put on coupling nut (5).
NOTE
Follow-on Maintenance Action Required:
1.
Do air system leak test. Refer to TM 9-2320-209-20.
2.
Replace power divider propeller shaft. Refer to
TM 9-2320-209-20.
Replace transfer-to-forward-rear axle propeller
3.
shaft. Refer to Propeller Shaft and Universal
Joint Removal and Replacement, TM 9-2320-209-20.
4.
Replace earth boring machine propeller shaft. Refer
to TM 9-2320-209-20.
END OF TASK