|
|
TM 9-2320-209-34-2-3
FRAME 6
Soldiers
1. Align screw holes in power divider propeller shaft (1) with screw
A and B
holes in power divider companion flange (2).
Soldier A
2. Put in four screws (3).
3. Put on four nuts (4).
Soldiers
4. Put two U-bolts (5) on bearing cups (6).
A and B
Soldier B
5. Put U-bolts (5) into holes in transmission transfer power takeoff
companion flange (7).
6.
Put four nuts (8) on U-bolts (5).
GO TO FRAME 7
18-166
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |