|
|
TM 9-2320-209-34-2-2
FRAME 3
Put one stud on main rod link (1) through holes in control rod (2) and latch
1.
bar (3), and put other stud on main rod link through chassis rail (4).
2.
Put link plate (5) over studs on main rod link (1).
Put on two castellated nuts (6) and aline holes in nuts and studs for cotter
3.
pins (7).
Put two cotter pins (7) through nuts (6).
4.
Do steps 1 through 4 again on other side of truck.
5.
GO TO FRAME 4
17-791
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |