Click here to make tpub.com your Home Page

Page Title: PIPELINE CONSTRUCTION TRUCK BODY REMOVAL, REPAIR, AND REPLACEMENT (TRUCK M756A2) - continued
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-209-34-2-2
FRAME 4
NOTE
Follow-on Maintenance Action Required:
Replace floorboards. Refer to para 17-62.
1.
Replace A-frame gin poles and side clamp
2.
assemblies.  Refer to TM 9-2320-209-20.
Replace stiff leg jacks.  Refer to Stiff Leg Jack
3.
Assembly Removal, Repair and Replacement,
TM 9-2320-209-20.
Replace auxiliary roller brackets. Refer to
4.
Auxiliary Roller Bracket Assembly Removal,
Repair and Replacement, TM 9-2320-209-20.
Replace tailboard roller. Refer to Tailboard
5.
Roller Assembly Removal, Repair and Replace-
ment, TM 9-2320-209-20.
Replace right rear blackout light mounting bracket
6.
and plug in stoplights and taillights. Refer to
Taillight and Stoplight Assembly (right side only)
Removal and Replacement (early model trucks
with turn signals), TM 9-2320-209-20.
Replace rear splash guards. Refer to
7.
TM 9-2320-209-20.
Replace end gate and side racks. Refer to Opera-
8.
tion of Cargo Trucks, TM 9-2320-209-10.
Replace tool box bracket. Refer to Tool Box
9.
Removal and Replacement, TM 9-2320-209-20.
END OF TASK
17-762

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business