|
|
TM 9-2320-209-34-2-2
FRAME 3
NOTE
Follow-on Maintenance Action Required:
Replace taillight wiring harnesses. Refer to
1.
TM 9-2320-209-20.
2.
Replace taillight assemblies. Refer to
TM 9-2320-209-20.
3.
Replace outrigger hydraulic lines. Refer to
TM 9-2320-209-20.
4.
Replace earth auger bits. Refer to
TM 9-2320-209-10.
5.
Replace splash shields. Refer to para 17-69.
6.
Replace earth boring machine. Refer to para 17-45.
Replace power divider. Refer to para 18-12.
7.
Replace cab protector. Refer to TM 9-2320-209-20.
8.
9.
Replace pioneer tool bracket. Refer to para 17-59.
END OF TASK
17-741
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |