|
|
TM 9-2320-209-34-2-2
FRAME
2
NOTE
Note length of threading at end of each rod (1) to
keep correct travel distance of rods.
1.
Take two nuts (2) off rod (1).
2.
Take beam (3) and two springs (4) off rod (1).
3.
Take stop (5) off rod (1).
4.
Take rod end (6) and nut (7) off rod (1).
5.
Do steps 1 through 4 again for other rod (1).
END OF TASK
17-635
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |