|
|
TM 9-2329-209-34-2-2
FRAME 5
1.
Put shifting rod (1) into center slot of bracket (2).
2.
Aline two retaining links (3) and put in three clevis pins (4). Put in three
cotter pins (5).
3.
Put handle (6) on shifting rod (1).
4.
Put spring (7) and washer (8) on shifting rod (1) through handle (6).
5.
Put nut (9) on end of shifting rod (1) and put in cotter pin (10).
NOTE
Follow-on Maintenance Action Required:
Replace horizontal leveling worm drive chains. Refer
to TM 9-2320-209-20.
END OF TASK
17-608
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |