|
|
TM 9-2320-209-34-2-2
FRAME 6
Put gasket (1) and boring case inspection plate (2) into place and aline
1.
screw holes.
2. Put in eight machine bolts (3) and lockwashers (4).
NOTE
Follow-on Maintenance Action Required:
1. Replace vertical leveling worm. Refer to para 17-50.
2. Replace power leveler. Refer to para 17-53.
3. Replace horizontal leveling worm. Refer to para 17-49.
4. Replace integral derrick assembly and auger rack bar.
Refer to para 17-56.
5. Fill intermediate gear case. Refer to
LO 9-2320-209-12/1.
END OF TASK
17-567
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |