|
|
TM 9-2320-209-34-2-2
FRAME 5
Soldier
A
Hold center ceiling panel (1) up.
1.
2. Put in 20 screws (2).
Soldier
B
3. Put inner window frame (3) in place and hold it.
Soldier
A
4. Put in 18 screws (4) around inner window frame (3).
Soldier
B
5. Put on clip (5).
NOTE
Follow-on Maintenance Action Required:
1. Replace dome light and fixture. Refer to
TM 9-2320-209-20.
2. Reconnect battery ground cable. Refer to
TM 9-2320-209-20.
3. Replace external power cable. Refer to Operation
of Shop Van and Instrument Repair Shop Van
Trucks, TM 9-2320-209-10.
END OF TASK
17-438
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |