|
|
TM 9-2320-209-34-2-2
FRAME
2
Soldiers 1.
Put right front ceiling panel (1) in place.
A and B
Soldier B 2.
Hold right front ceiling panel (1).
Soldier A 3.
Put in 16 screws (2).
Soldier B 4.
Hold center ceiling panel (3) up.
Soldier A 5.
Put in 20 screws (4).
Soldier B 6.
Put inner window frame (5) in place and hold it.
Soldier A 7.
Put in 18 screws (6) around inner window frame (5).
8.
Put on clip (7).
NOTE
Follow-on Maintenance Action Required:
1.
Replace dome light and fixture. Refer to
TM 9-2320-209-20.
2.
Reconnect battery ground cable. Refer to
TM 9-2320-209-20.
3.
Replace external power cable. Refer to Operation
of Shop Van and Instrument Repair Shop Van
Trucks, TM 9-2320-209-10.
END OF TASK
17-428
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |