|
|
TM 9-2320-209-34-2-2
FRAME 15
NOTE
Follow-on Maintenance Action Required:
Put on water segregator tank. Refer to
1.
TM 9-2320-209-20.
Put on fuel delivery pump. Refer to
2.
TM 9-2320-209-20.
Put on gallon indicating meter. Refer to
3.
TM 9-2320-209-20.
Put on fuel drain manifold. Refer to
4.
TM 9-2320-209-20.
Put on gate valves. Refer to TM 9-2320-209-20.
5.
Put on discharge valves. Refer to TM 9-2320-209-20.
6.
Put on discharge valve operating lever. Refer to
7.
TM 9-2320-209-20.
Put on discharge valve cables. Refer to
8.
TM 9-2320-209-20.
Put on emergency valve release cable. Refer to
9.
TM 9-2320-209-20.
10.
Put on pioneer tool bracket. Refer to para 17-59.
11.
Put on splash shields. Refer to para 17-69.
12.
Put on front propeller shaft. Refer to Propeller
Shaft and Universal Joint Removal and Replacement,
TM 9-2320-209-20.
Put on intermediate propeller shaft. Refer to
13.
Propeller Shaft and Universal Joint Removal and
Replacement, TM 9-2320-209-20.
Put on rear propeller shaft. Refer to Propeller
14.
Shaft and Universal Joint Removal and Replacement,
TM 9-2320-209-20.
15.
Refill fueling holding compartments. Refer to
TM 9-2320-209-20.
END OF TASK
17-326
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |