|
|
TM 9-2320-209-34-2-2
Soldier A 1.
Unscrew three line nuts (1).
Soldier B 2.
Take off three lines (2).
Soldier A 3.
Hold two nuts (3).
Soldier B 4.
Take out two screws (4).
5. Take off gage assembly (5).
GO TO FRAME 10
17-299
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |