|
|
TM 9-2320-209-34-2-2
FRAME 3
Put on bearing sleeve (3) and lever (4).
Put on trip cam (1). Tighten setscrew (2).
1.
2.
Put on bracket (5).
Put on fusible link (6) and cotter pin (7). Put on fisible link release
3.
lever (8) and cotter pin (9).
4. Do step 1 for other lever.
GO TO FRAME 4
17-215
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |