|
|
TM 9-2320-209-34-2-2
FRAME 2
Put line (1) in place and tighten two coupling nuts (2).
1.
Slide rubber seal (3) over pipe connection (4).
2.
Put coupling (5) in place and put in screw (6) and nut (7) on each side of
3.
coupling.
GO TO FRAME 3
17-203
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |