|
|
TM 9-2329-209-34-2-2
FRAME 3
1.
Slide gasket (1) into place. Put both halves of coupling (2) over gasket.
Put two bolts (3) through holes in coupling (2). Put on two nuts (4).
2.
Do steps 1 and 2 again for coupling (5).
3.
Put gasket (6) into place. Put both halves of coupling (7) over gasket.
4.
5.
Put two bolts (8) through holes in coupling (7). Put on two nuts (9).
GO TO FRAME 4
17-195
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |