|
|
TM 9-2320-209-34-2-2
FRAME
11
Drill out rivet (1).
1.
2.
Working through inspection hole (2), lift front glass run channel (3) with
retaining clip (4) up and out of retaining bracket (5).
3.
Slide front glass run channel (3) up and out top of door (6).
GO TO FRAME 12
17-63
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |