Click here to make tpub.com your Home Page

Page Title: Replacement
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-209-34-2-1
FRAME 2
Put in 12 screws and lockwashers (l).
1.
2.  Evenly tighten 12 screws and lockwashers (1) to 23 to 26 pound-feet.
3.  Take jack out from under truck.
NOTE
Follow-on Maintenance Action Required:
1.  Replace transmission power takeoff rod (truck M342A2).
Refer to TM 9-2320-209-20.
2.  Replace hydraulic hoist pump drive shaft (truck M342A2).
Refer to TM 9-2320-209-20.
3.  Replace transmission power takeoff rod (trucks with
front winch). Refer to TM 9-2320-209-20.
4.  Replace front winch drive shaft (trucks with front
winch). Refer to TM 9-2320-209-20.
5.  Replace transmission-to-transfer propeller shaft.
Refer to TM 9-2320-209-20.
6.  Replace transfer reverse shift lever rod. Refer to
TM 9-2320-209-20.
7.  Replace clutch control rod. Refer to Clutch Linkage
Assembly, TM 9-2320-209-20.
8.  Put in new front and intermediate cab tunnels. Refer
to TM 9-2320-209-20.
9.  Put in new transmission gearshift lever. Refer to
TM 9-2320-209-20.
10.  Fill transmission. Refer to LO 9-2320-209-12/1.
END OF TASK
8-28

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business