|
|
TM 9-2320-209-34-2-1
1.
Put switch cover (1) in place and aline screw holes. Put in two screws (2).
2.
Put circuit breaker box cover (3) in place and aline screw holes. Put in four
screws (4).
NOTE
Follow-on Maintenance Action Required:
1. Replace front access panel. Refer to Part 2,
para 17-41.
2. Replace ceiling panels and insulation. Refer to
Part 2, para 17-41.
3. Replace all 115-volt dome light fixtures. Refer
to TM 9-2320-209-20.
4. Connect all van body external power sources.
Refer to TM 9-2320-209-10.
5. Reconnect battery ground cable. Refer to
TM 9-2320-209-20.
END OF TASK
7-39
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |