|
|
TM 9-2320-209-20-3-4
FRAME 2
Hook snatch block (1) on center of spreader tube on A-frame (2).
Soldier A 1.
Soldiers 2.
Lift up A-frame (2) until soldier C has enough slack to put end
A and B
loop of cable (3) on pintle hook (4) and hold A-frame in place.
When there is enough slack in cable (3), put eyebolt (5) over
Soldier C 3.
loop end of cable. Open pintle hook (4) and put looped end of
cable around pintle hook as shown.
4.
Put washer (6) and plate (7) on back of truck and aline screw
hole. Put eyebolt (5) in place. Tell soldiers A and B when
finished.
Soldiers 5.
Lower A-frame (2) to position shown.
A and B
GO TO FRAME 3
23-130
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |