|
|
TM 9-2320-209-20-3-4
FRAME 2
1.
Aline splines on driveshaft (1) with splines in universal joint yoke (2). Put
propeller shaft into universal joint yoke.
2. Working at hydraulic hoist pump (3), aline keyway in universal joint yoke (4)
with woodruff key on hydraulic hoist pump shaft (5).
3. Push universal joint yoke (4) on hydraulic hoist pump shaft (5). Using ruler,
leave 1/2 inch space between universal joint yoke and hydraulic hoist pump
(3).
4. Using 3/8-inch wrench, screw in and tighten setscrew (6).
NOTE
Follow-on Maintenance Action Required:
If universal joints were replaced, lubricate universal
joints. Refer to LO 9-2320-209-12/1.
END OF TASK
19-112
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |