|
|
TM
9-2320-209-20-3-3
FRAME 4
Soldier A 1.
Using pliers, pull out and throw away cotter pin (1). Slide off
arm (2).
2.
Using 9/16-inch wrench, hold six cap screws (3).
Using 9/16-inch socket wrench, extension, universal joint, and
Soldier B 3.
ratchet, unscrew and take off six nuts (4).
Take out six capscrews (3).
Soldier A 4.
5.
Hold discharge valve (5) in place.
Soldier B 6.
Using 9/16-inch wrenches, unscrew and take out six capscrews
(6) and flat washers (7).
Take out discharge valve (5) and two gaskets (8). Throw away
Soldiers 7.
A and B
two gaskets.
END OF TASK
18-267
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |