|
|
TM
9-2320-209-20-3-3
FRAME 3
Hold up discharge pipe (1).
Soldier A 1.
Using 3/4-inch open end wrench, unscrew and take off two
Soldier B 2.
nuts (2).
Take out U-bolt (3).
3.
Do steps 2 and 3 again for other three U-bolts (3).
4.
Take out discharge pipe (1).
5.
Soldiers
A and B
NOTE
Discharge pipe (4) has two U-bolts (3).
Do steps 1 through 5 again for other discharge pipe (4).
6.
END OF TASK
18-83
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |