|
|
TM
9-2320-209-20-3-3
Hold up discharge pipe (1).
Soldier A 1.
Soldier B 2.
Using 9/16-inch open end wrench, take off two nuts (2).
3.
Takeout U-bolt (3).
Do steps 2 and 3 again for other three U-bolts (3).
4.
Take out discharge pipe (1).
Soldiers 5.
A and B
Do steps 1 through 5 again for other two discharge pipes (1).
6.
END OF TASK
18-80
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |