|
|
TM
9-2320-209-20-3-3
FRAME 3
Put cable (1) on valve lever (2) so it will be held by U-bolt (3). Put U-bolt
1.
through holes in valve lever.
Start two nuts (5) onto U-bolt.
2.
Put plate (4) onto U-bolt (3).
3.
Using pliers, pull cable (1) through U-bolt (3) to take out most of the slack.
While holding cable, using 7/16-inch wrench, tighten two nuts (5).
END OF TASK
18-72
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |