|
|
TM
9-2320-209-20-3-3
FRAME 2
1.
Put five washers (1) on five pins (2) and put pins through hinge parts (3).
Put five washers on other end of pins.
2.
Put five cotter pins (4) through holes in ends of five pins (2). Using pliers,
bend open ends of cotter pins.
Put hooks (5) through posts (6) and into tailgate (7) on both sides of truck.
3.
4.
Lower hoist and unhook lifting sling (8) from hoist hook. Take off lifting
sling and hoist.
END OF TASK
18-51
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |