|
|
TM
9-2320-209-20-3-2
FRAME
2
1.
Screw spring (1) onto couplkng nut (2). Put spring and coupling
nut
onto
hose (3) with coupling nut to end of hose being worked on.
2.
One
end
has
longer
slots
on
outside.
Find
the
end
with
Check
sleeve
(4).
longer
slots.
Hold
sleeve
(4)
so
that
end
with
longer
slots
is
to
end
of
hose
(3)
being
3.
worked
on.
4.
Screw
sleeve
(4)
onto
hose
(3)
so
hose
is
5/16
inch
up
from
end
of
hose.
Measure
with
ruler.
GO
TO
FRAME
3
13-284
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |