|
|
TM 9-2320-209-20-3-1
FRAME 2
Hold intermediate propeller shaft (1) in place.
Soldier A
1.
Put four rubber bushings (2) in pillow block housing (3).
Soldier B
2.
Line up holes in pillow block housing (3) with holes in frame (4).
3.
Put bolt (5) through each hole in frame (4).
4.
5.
Put flat washer (6) on each bolt (5) and screw on and hand
tighten nut (7).
GO TO FRAME 3
10-6
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |