Click here to make tpub.com your Home Page

Page Title: TRANSMISSION TRANSFER CONTROLS AND LINKAGE (WITHOUT POWER TAKEOFF) REMOVAL, REPAIR, AND REPLACEMENT - continued
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-209-20-3-1
WARNING
Spring (1) is under pressure. When retaining ring (2)
is taken off, let go of reverse shift rod (3) slowly to
keep it from flying out and causing injury to personnel.
1.  Put reverse shift rod housing (4) into vise.
Soldier A
Place wood block over end of reverse shift rod (3). Press down
2.
on rod until spring (1) is compressed below retaining ring (2).
Tell soldier B when spring is compressed.
When soldier A has spring (1) compressed, using retaining ring
3.
Soldier B
pliers, take off retaining ring (2).  Tell soldier A when retaining
ring is off.
When retaining ring (2) is off, slowly ease up on wood block until
4.
Soldier A
pressure is off; then take wood block away.
WARNING
Spring (1) is under pressure. Hold spring compressed in
vise when taking off locknut (6) to keep personnel from
being injured.
5.  Pull out reverse shift rod (3), spring (1), two flat washers (5),
and locknut (6) from reverse shift rod housing (4). Take housing
from vise and put spring into vise.
Using 3/8-inch wrench, hold reverse shift rod (3).
6.
Soldier B
Using 9/16-inch wrench, unscrew and take off locknut (6). Take
7.
Soldier A
off spring (1) and two flat washers (5).
END OF TASK
9-32

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business