Click here to make tpub.com your Home Page

Page Title: TRANSMISSION TRANSFER CONTROLS AND LINKAGE WITH POWER TAKEOFF REMOVAL AND REPLACEMENT - continued
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-209-20-3-1
FRAME 2
1.
Push shifter shaft lever (1) toward rear of truck as far as it will move. This
is neutral position,
Place link assembly (2) as shown and check to see if ball joint studs (3) aline
2.
with holes in shift control lever (4) and shifter shaft lever (1).
If ball joint studs (3) aline and seat firmly in holes, screw on two locknuts (5).
3.
Use one 5/8-inch wrench to hold two studs while tightening two locknuts with
3/4-inch wrench.
If ball joint studs (3) do not aline and seat firmly in holes, do steps 5, 6, and
4.
7 to shorten or lengthen link assembly (2).
Using 3/4-inch wrenches, loosen two jamnuts (6).
5.
Using vise grip pliers, turn link assembly (2) left or right as necessary until
6.
ball joint studs (3) aline with holes.
7.  Using 3/4-inch wrenches, tighten two jamnuts (6) and do step 3 again.
END OF TASK
9-15

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business