|
|
TM 9-2320-209-20-3-1
FRAME 3
Push connector (1) on battery-ground indicator (2) as tagged.
1.
Push two connectors (3) on oil pressure gage (4) as tagged.
2.
Join hose (5) to air pressure gage (6). Using 9/ 16-inch wrench, screw on
3.
and tighten nut (7).
Take off tags.
4.
Go TO FRAME 4
7-71
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |