Click here to make tpub.com your Home Page

Page Title: INSTRUMENT CLUSTER REMOVAL AND REPLACEMENT - continued
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-209-20-3-1
FRAME 5
1.
Pull off connector (1) from battery-generator indicator (2).
2.
Pull off two connectors (3) from oil pressure gage (4).
Using 9/16-inch wrench, unscrew nut (5) and take off hose (6) from air
3.
pressure gage (7).
4.
Set instrument cluster (8) aside.
5.
Using 3/8-inch wrenches, hold stud (9) under harness assembly (10) and
unscrew and take off nut and lockwasher (11).
END OF TASK
7-68

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business