|
|
TM 9-2320-209-20-3-1
FRAME 5
Aline hole in rod end clevis (1) with hole in bracket (2) by moving radiator (3).
1.
Put bolt (4) through clevis (1) and bracket (2). Using 9/16-inch wrenches,
2.
screw on and tighten locknut (5) on bolt.
Make sure clamps (6) are positioned squarely on hose (7). Using screwdriver,
3.
tighten two clamp screws (8).
NOTE
Follow-on Maintenance Action Required:
Fill cooling system. Refer to para 6-10.
1.
2.
Start engine. Refer to TM 9-2320-209-10.
3.
Run engine until operating temperature is reached.
Check that engine temperature levels off between
160 and 180 as indicated on temperature gage.
Check hose fitting on thermostat and radiator
for leaks.
4.
Stop engine. Refer to TM 9-2320-209-10.
5.
Close hood and side panels. Refer to
TM 9-2320-209-10.
END OF TASK
TA
085566
6-38
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |