|
|
TM 9-2320-209-20-1
Section II. MAINTENANCE ALLOCATION CHART - Cont
(1)
(2)
(3)
(4)
(5)
(6)
Group
Component/Assembly
Maintenance
Maintenance Level
Tools and
Remarks
Number
Function
Equipment
C
O
F
H
D
18
BODY, CAB, HOOD AND HULL
1812
Special Purpose Bodies
Body, Pipeline Construction
Repair
4.0
20
HOIST, WINCH, CAPSTAN,
WINDLASS, POWER CONTROL
UNIT AND POWER TAKEOFF
2001
Hoist, Capstan, Windlass, Crane
or Winch Assembly
Winch Assembly (Rear)
Service
0.3
Adjust
1.0
Replace
1.6
Repair
2.0
3.0
2004
Power Takeoff
Replace
1.0
Repair
24
Sprocket, Transfer PTO
Replace
0.2
B-23
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |