Click here to make tpub.com your Home Page

Page Title: Section II. MAINTENANCE ALLOCATION CHART - continued
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-209-20-1
Section II. MAINTENANCE ALLOCATION CHART - Cont
(1)
(2)
(3)
(4)
(5)
(6)
Group
Component/Assembly
Maintenance
Maintenance Level
Tools and
Remarks
Number
Function
Equipment
C
O
F
H
D
33
SPECIAL PURPOSE KITS - cont
3307
Special Purpose Kits
A-Frame Kit
Install
2.0
Inspect
0.2
Repair
0.5
Decontamination Bracket Kit
Install
1.0
Replace
0.3
47
GAGES (NON-ELECTRICAL)
4701
Instruments (Speed and Distance)
Speedometer
Replace
0.4
Shaft Assembly, Flexible
Replace
0.4
Replace
0.4
Shaft Assembly, Flexible
Replace
0.4
Joint, Angle Drive
Replace
0.6
Repair
0.6
SUPPLEMENT NUMBER 1
Truck, Dump, 2-1/2 Ton, 6x6,
M342A2
NOTE: This supplement
pertains to maintenance
operations peculiar to the
Truck, Dump, M342A2, and
must be used in conjunction
with basic allocation chart.
18
BODY
Body, Dump
Repair
3.0
Tailgate
Replace
0.6
Repair
1.0
B-15

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business