|
|
TM 9-2320-209-20-1
CHAPTER 2
CHECKOUT, ALINEMENT, AND ADJUSTMENT
2-1. GENERAL. There are no scheduled checkout, alinement, or adjustment procedures to be done at organizational
level of maintenance other than those in PMCS tables.
CHAPTER 3
LUBRICATION
3-1. GENERAL. Refer to LO 9-2320-209-12/1 for lubrication of the truck.
3-2. SPECIAL INSTRUCTIONS. There are no special lubrication instructions for trucks operating under unusual
conditions other than those given in LO 9-2320-209-12/1.
CHAPTER 4
SCHEDULED MAINTENANCE OF MATERIAL USED
IN CONJUNCTION WITH MAJOR ITEMS
4-1. GENERAL. These preventive maintenance checks and services (PMCS) cover the special purpose kits supplied as
part of the truck. The special purpose kits include the bow and tarp kit, hot water personnel heater kit, arctic winterization
kit, deep water fording kit, electric brake kit, and A-frame kit.
4-2. PMCS PROCEDURES. Refer to TM 9-2320-209-10 for preventive maintenance checks and services for the special
purpose kits.
2-1/3-1/4-1/(4-2 blank)
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |