|
|
TM 9-2320-209-20-1
Table 1-9. Organizational Preventive Maintenance Checks and Services Semiannual Schedule
for M764 Earth Boring Machine and Polesetter Truck - Cont
Item
Procedures
Item
To Be
Check for and Have Repaired,
No.
Inspected
Replaced, Adjusted as Necessary
1
6. Check that winch cable (4) is not kinked, and
(cont)
does not have broken wires or broken and
loose clamps.
7. Wind winch cable (4) back on drum (5). Refer
to TM 9-2320-209-10.
8. Check adjustment of winch automatic brake.
Automatic brake should hold a 1,000 pound
load without slipping. Refer to Vol 3,
chapter 19, para 19-3 for test and adjust-
ment procedures.
2
Earth boring
1. Check tension on horizontal and vertical
machine
drive chains as follows:
(a) Take off drive chain covers. Refer to
Vol 3, chapter 19, para 19-17.
(b) Check that there is 1/8-inch slack in
leveling worm drive chains (1 through 4).
1-58
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |