|
|
TM 9-2320-209-20-1
Table 1-9. Organizational Preventive Maintenance Checks and Services Semiannual Schedule
for M764 Earth Boring Machine and Polesetter Truck
Item
Procedures
Item
To Be
Check for and Have Repaired,
No.
Inspected
Replaced, Adjusted as Necessary
1
Rear winch
1.
Check that rear winch control linkage (1) is
not loose or damaged.
2.
Check rear winch control lever and POWER
DIVIDER control lever for proper operation.
Refer to TM 9-2320-209-10.
3.
Check that idler pulley (1) is not damaged
and is tight against worm drive chain (2).
There should be no slack in worm drive
chain.
1-55
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |