|
|
TM 9-2320-209-20-1
Table 1-5. Organizational Preventive Maintenance Checks and Services Semiannual Schedule
for M109A2, M109A3, M185A2, and M185A3 Shop Van Trucks - Cont
Item
Procedures
Item
To Be
Check for and Have Repaired,
No.
Inspected
Replaced, Adjusted as Necessary
3
Van body
1. Check that van body personnel heaters (1 and
2), electrical connections (3 and 4), fuel
connections (5 and 6) are not leaking, loose,
or damaged.
1-37
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |