|
|
Operator/Crew Preventive Maintenance Checks and Services
for Special Purpose Kits - Cent
NOTE: These checks are to be made in the order listed, within designated interval.
M-Monthly
A-After operation
B-Before operation
W-Weekly
D-During operation
Interval
Equipment is
Item to be Inspected
Item
not ready/
Procedure: Check for and have repaired, filled,
No.
available if:
or adjusted as needed
BD Aw
A-FRAME KIT
3
a. Before operating A-frame (1) , make
q
sure it is positioned at about a 60 angle and
securely attached to the front bumper
the inverted
hook (2) . Also check
that:
is frayed
Cable clamps (3) are not loose
q
or broken.
Cable assembly (4) is not frayed
q
or broken
045372
WARNING
Use leather gloves when checking
winch cable. Injury to hands may
result if gloves are not worn.
Inspect A-frame ( 1) for bends and winch
q
cable (5) for kinks, frays, and breaks.
4-7 /(4-8
1
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |