|
|
TM 9-2320- 209-10-2
Table 1-8.
Operator/Crew Preventive Maintenance Checks and Services
for
Pipeline Construction Truck - Cent
These checks are to be made in the order listed, within designated interval.
NOTE :
M-Monthly
A-After operation
B-Before operation
W-Weekly
D-During operation
Interval
Equipment is
Item to be Inspected
Item
not ready/
Procedure: Check for and have repaired, tilled,
No.
available if:
or adjusted as needed
w
B D
--
-- .
REAR WINCH
3
a. Visually check rear winch drive
q
chain (1) for damage.
045347
b . Check that rear winch shear pin (2)
is in place and serviceable (located on back
side of sprocket).
A FRAME
4
A-Frame cannot
Check that A-Frame parts are not
be used due to
missing, broken, or damaged.
damaged or
missing parts.
--
--
1-30
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |