Click here to make tpub.com your Home Page

Page Title: Table 5-1. Wiring Harness W20.
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-6115-663-13&P
3. Refer to power plant wiring diagram (figure FO-1) for identification of components inside switch box
assembly and check:
a. Refer to table 5-1 and check continuity of wiring harness W20 (7).
Table 5-1. Wiring Harness W20.
From
To
Wire Number
1
XDS1-1
P3-A
2
XDS1-2
P3-B
XDS3-2
P3-C
3
4
P3-D
S1-3
P3-F
5
S1-5
P3-G
6
S1-6
P3-H
7
S2-6
8
P3-I
S2-5
P3-K
9
S2-3
10
XDS4-2
P3-L
11
XDS2-1
P3-M
XDS2-2
P3-N
12
13
S1-3
XDS3-1
XDS4-1
S2-3
14
b. Remove electrical connector cover, refer to table 5-2 and check continuity of wiring harness W9 (18).
NOTE
The bus bar is physically connected to LO of the switch box assembly and is a common
ground. Wires connected to bus bar maybe connected to any terminal on the bus bar.

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business