Click here to make tpub.com your Home Page

Page Title: INSTALLATION
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-6115-663-13&P
4. With switch (12) in OFF position, check continuity of switch between:
a. Terminals 3 and 5
b. Terminals 2 and 6
c. Terminals 3 and 6
d. If there is continuity in step a, b, or c, replace switch.
INSTALLATION
1.
Remove nut (7), lock washer (8), and locking ring (9) from new switch.
2.
Hand tighten nut (11) on switch.
NOTE
Make sure terminals 3 and 6 of switch are toward bottom of panel when
installing switch.
Insert switch body (12) into mounting hole and position nut (11) against control panel assembly (10).
3.
4.
Install locking ring (9) into keyway of switch until alignment tip goes into control panel assembly
(10).
Install lock washer (8) against locking ring (9).
5.
6.
Install nut (7) and tighten, making sure that locking ring (9) alignment tip is engaged in control
panel assembly (10).
7.
Remove screws (16) with washers from terminals of new switch (12).
Install conductor bus (13) between terminals 2 and 5.
8.
9.
Install tagged wires, screws (16), and washers (14 and 15) to terminals.
10. Position control panel assembly (10) with gasket (17) on switch box cover (6) and align mounting
holes.
11. Install 8 new lock washers (3), flat washers (2), and screws (4).
12. Close switch box cover (1) and secure with clamping catch (5).
4-26

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business